0
UPDATE 5 December 2006
My builder returned to the site today after undergoing a knee reconstruction on Thursday of last week. How is that for dedication??
here are the latest pictures. Forgive me for the darkness but this is Daylight savings Sydney time 7.30pm
This new area now completed is 3.6 metres by 6.4 metres giving a grand total for the beer garden of 56 Metres of decking. Next step will be the;
- fitting of decking boards,
- hand rail (wide enough for a beer to sit on)
- steps to the back yard (to send loud and obnoxious kids away from the central beer consuming area)
- colorbond roof (to allow for all weather beer consumption)
- fitting of lighting (to allow night time beer consumption)
- power points (beer fridge)
- gas line (for beef cooking implement)
Further updates to follow as they come to hand